Harrods / Tekzone
Type
Retail Fit-Out
Programme
2026
Size
1,076 sq ft
Project Value
£0.23m
Role
Main Contractor
Client
Loewe Technology GmbH
Project Overview
Branded retail unit within the Tekzone at Harrods
Storcs was appointed as Main Contractor for the redevelopment of a retail unit within the Tekzone TV Retail Area on the Fifth Floor of Harrods, London, comprising approximately 1,076 sq ft.
The works involve the demolition and strip-out of the previous retail concept, followed by the full construction and fit-out of a new branded commercial unit for Loewe Technology GmbH — within one of London’s most prestigious and operationally demanding retail environments.
Scope of Works
- Demolition and strip-out of existing retail unit
- Specialist joinery manufacture and installation
- Electrical services and distribution
- Lighting coordination and integration
- Fire alarm interface and compliance detailing
- Programme and logistics coordination within live Harrods environment
- Full internal redevelopment of unit
- Final inspection and handover
Key Consideration
Live Retail Construction Inside Harrods
This project required exceptional programme precision and logistics management. All works were carried out within a fully operational retail environment, with strict controls over delivery windows, noise, dust and access. Storcs coordinated directly with Harrods facilities management to ensure zero disruption to surrounding retail operations throughout the fit-out period.